BMC Remedy
ITSM 8.1 Messages #1541310
Filter
INT:CHGTMS:TAS:CheckScheduledDateChange_010
The selected scheduled dates fall outside of the scheduled dates for Change: $10000006$.
The Scheduled Dates for the Change are:
Start - $1000000284$
End - $1000000640$
Specify dates within this range.